From a form to a yardage
Every concrete order begins with the volume of a form. This hub holds 19 tools, grouped by shape and purpose. Flat work is covered by the Concrete Slab Calculator, Concrete Driveway Calculator, Concrete Patio Calculator, Concrete Sidewalk Calculator and Concrete Pad Calculator. Linear elements use the Concrete Trench Calculator, Concrete Beam Volume Calculator and Concrete Curb Calculator. Vertical work is handled by the Concrete Wall Calculator and Concrete Basement Wall Calculator. Cylinders and columns use the Round Slab Concrete Calculator, Concrete Column Calculator, Concrete Pier Calculator and Concrete Sonotube Calculator. The general Concrete calculator and the Concrete Cost Calculator, Concrete Weight Calculator, Concrete Coverage Calculator and Concrete Quantity Calculator complete the set. The rectangular tools, including the general one, take length, width and depth in meters plus an allowance percentage. The four cylinder tools take an internal diameter and a height in meters.
Rectangular volume and the yard
For slabs, pads, walks and walls, volume is length times width times thickness. A 10 foot by 10 foot slab that is 4 inches thick has 100 square feet times one third of a foot, which is 33.3 cubic feet, or 1.23 cubic yards. Ready-mix is sold by the cubic yard of 27 cubic feet, and in metric countries by the cubic meter. In the tools, enter all three dimensions in meters: a 3 m by 3 m slab that is 0.1 m thick is 0.9 m³, or 0.99 m³ with a 10 percent allowance. For walls, thickness is the smallest dimension, and the height is the vertical measurement. The same approach works for footings and beams, where the cross-section is the width times depth and the length extends it.
Cylinders, columns and piers
Round shapes use the area of a circle, pi times radius squared, times height. A 12 inch diameter pier that is 4 feet deep has a radius of 0.5 feet, an area of 0.785 square feet and a volume of 3.14 cubic feet. Ten of them need 31.4 cubic feet, or 1.16 cubic yards. In meters, a pier 0.3 m across and 1.2 m deep holds about 0.085 m³, and ten of them about 0.85 m³. Cardboard forms sold as Sonotube come in set diameters, and the internal diameter you enter should match the form. The Round Slab Concrete Calculator applies the same circle area with the slab thickness as the height. Footings often flare at the bottom, so add the extra volume of a wider base as a separate shape.
Choosing thickness
Thickness depends on the use and on local building rules. Four inches is a common figure for residential walks, patios and light-duty slabs, with thicker sections where vehicles drive. Driveways are commonly poured thicker than patios, and footings and foundation walls are designed by dimension and load. Basement walls are poured in forms with thickness set by the structural design. This page cannot set those values for you. Use the thickness from your plans, the building department or an engineer. Sub-base preparation matters as much as thickness, since a slab on poorly compacted soil can crack regardless of depth. Reinforcement, control joints and cure practices follow standards such as those from the American Concrete Institute.
Waste, overage and ordering
Forms are never perfect, subgrades vary and some concrete is lost in pumping and washing. Many contractors add 5 to 10 percent to the calculated volume, which is what the allowance field in the tools is for, and sometimes more for irregular excavations. Ordering short can mean a second delivery and a cold joint, which is worse than a small surplus. Ready-mix suppliers often have a minimum load charge or a short-load fee below a certain volume, so a 1 cubic yard order may cost far more per yard than 4. For small jobs, bagged mix may be cheaper. Ask the plant about its minimums, the time allowed for unloading and any added charges for waiting time.
Bags versus ready-mix
Bagged concrete is sold by weight, and the yield depends on the product. An 80 pound bag yields about 0.6 cubic feet and a 60 pound bag about 0.45, though labels differ, so check the bag. The 10 by 10 by 4 inch slab, 33.3 cubic feet, would take roughly 56 bags of 80 pound mix, which is 4,480 pounds to carry and mix. Beyond about a cubic yard, most people switch to ready-mix delivery or rent a mixer. Each bag needs water measured as the label states, since too much water weakens the result. The Concrete Quantity Calculator turns an area, a depth and an allowance into an ordered volume, and the Concrete Coverage Calculator divides a volume by a depth to give the area it covers, so both help compare options.
Weight and cost
Reinforced and plain concrete weighs about 150 pounds per cubic foot, or roughly 4,000 pounds per cubic yard, a figure useful for checking truck loads, supports and delivery access. The Concrete Weight Calculator multiplies a volume in cubic meters by the bulk density in kg/m³ that you enter, and 150 pounds per cubic foot is about 2,400 kg/m³. The Concrete Cost Calculator multiplies the ordered volume by your price per cubic meter and adds the delivery and other quoted charges you enter, which is where a pump fee can go. Prices depend on mix strength, additives, region and season. Higher strength mixes, fibers, air entrainment for freeze-thaw climates and colored or special finishes all change the price. Get quotes for the mix your design specifies, and treat default numbers as illustrative.
Coverage and thickness trade-offs
One cubic yard covers 81 square feet at 4 inches, 54 square feet at 6 inches and 108 square feet at 3 inches. A small change in thickness has a large effect on cost, so thickening a 400 square foot patio from 4 to 5 inches adds about 1.2 cubic yards. Use coverage figures to compare designs quickly and to sanity check a result. If a tool says a 10 by 10 slab needs 6 cubic yards, something is wrong, since the correct figure is near 1.2 at 4 inches. Do not reduce thickness below the design value to save money, because strength and cracking behavior depend on it.
Safety, curing and professional advice
Fresh concrete is caustic and can burn skin. Wear gloves, boots and eye protection, and wash off splashes promptly. Concrete gains strength over weeks as it cures, with moisture retention for the first days improving the result, and hot or freezing weather needs special measures. Structural elements, retaining walls, load-bearing footings and anything near a building should follow engineered drawings and local permits. These calculators estimate volumes and costs and do not check structural adequacy, soil conditions, drainage or code compliance. When the consequences of a failure are serious, consult a licensed professional.
Frequently asked questions
- How much concrete do I need for a 10 by 10 slab 4 inches thick?
- About 33.3 cubic feet, or 1.23 cubic yards, before adding waste. With 10 percent extra, order about 1.35 cubic yards.
- How many 80 pound bags make a cubic yard?
- Roughly 45 bags, using a yield of about 0.6 cubic feet per bag. Check the yield printed on your product.
- Should I round up my order?
- Yes, modestly. Many people add 5 to 10 percent and round to what the plant delivers.
- Do these tools check structural requirements?
- No. They estimate quantity and cost. Use drawings, local codes and a qualified professional for structural design.