Round forms, round volumes

Fiber tube forms are used for footings under posts, deck piers, porch columns and fence or sign posts. Sonotube is a brand name of the Sonoco company, and the same kind of cardboard form is sold under other names. Each tube is a cylinder, so the concrete it holds follows the cylinder formula. This page asks for the internal diameter, the height you intend to fill and an allowance, and returns the cylinder volume and the volume with allowance. The calculation is for a plain circular cylinder. A flared bottom, a bell footing or a square pad beneath the tube is a separate shape that you measure and add yourself.

The formula, step by step

Volume = pi × (diameter / 2)² × height, and the volume with allowance is that value × (1 + allowance / 100). Squaring the radius means diameter has a strong effect: doubling the diameter quadruples the volume for the same height. The page opens with a diameter of 2 m, a height of 1 m and a 0 percent allowance, so the result is pi × 1² × 1, which is 3.141593 m³ to six decimals. Those defaults describe a very large cylinder, nothing like a post footing, so replace them. All lengths are in meters, and a tube sold as 12 inches must be entered as 0.3048 m.

Example: eight pier footings for a deck

A deck might need eight piers, each in a 300 mm tube filled to a height of 1.2 m. Entering 0.3 and 1.2 gives 0.084823 m³ per pier. Eight piers need 0.678584 m³, and the page does not multiply by count, so do that step yourself. Because the quantity is small, ordering ready-mix is unlikely to be practical. Divide the volume with allowance by the yield of the bag you plan to use. At roughly 0.6 ft³ for an 80 lb bag, a figure that varies by product, eight such piers take close to 40 bags, which is a useful number to know before you load the truck.

Example: a larger column with an allowance

For a 400 mm column form filled to 1.5 m, the cylinder volume is 0.188496 m³. Adding a 10 percent allowance gives 0.207345 m³. The extra covers concrete left on the chute, a slightly overfilled top and any irregularity in the tube wall. Cardboard forms can swell or deform when wet, which shifts the real diameter by a few millimeters, and the squared radius magnifies that. If you want to see the sensitivity, run the same height at 0.39 m and 0.41 m and compare. The difference is small per tube but adds up across a dozen footings.

Getting the internal diameter right

Nominal tube sizes refer to the inside diameter, and common sizes in the United States run from 8 inches upward in 2 inch steps. Metric suppliers list sizes such as 200, 250 and 300 mm. The paper wall is a few millimeters thick, so the outside is slightly larger than the label, and that matters if you are fitting the tube into a drilled hole. Measure across the inside of the tube with a tape or caliper if the label is missing. Use the same unit for height and diameter, and remember that the page works in meters. One inch is exactly 25.4 mm, so a 10 inch tube is 0.254 m. A 10 inch tube filled to 1 m holds 0.050671 m³, or about 1.79 ft³. If you work in feet, convert the fill height to meters by multiplying by 0.3048 before you type it.

Measuring the fill height

The fill height is the distance from the bottom of the hole to the top of the concrete, not the length of the tube you cut. For a footing below the frost line, include the full depth of the excavation that you fill with concrete. If the tube extends above grade to form a pier, the part above grade counts too. Concrete poured into a hole with no tube below the ground line is not a perfect cylinder, because the hole walls are rough and often wider than planned. Add an allowance for that. The page treats every entry as a smooth circular cylinder with a flat bottom.

Footings, bells and reinforcement

Many designs call for a footing wider than the pier, such as a bell shape or a square pad. The page does not calculate those shapes. Estimate them separately, for example with the slab page for a rectangular pad, and add the results. Rebar cages and anchor bolts displace a tiny amount of concrete, which the allowance absorbs. Footing depth, diameter and reinforcement for your project are design decisions that depend on soil bearing, frost depth and the loads on the structure. Follow local code or the engineer's drawings. This page offers a volume, and it gives no structural advice.

Volume per meter of tube

It helps to know the volume per meter of height for the tube sizes you use, since that lets you scale quickly when the hole depth changes on site. A 200 mm tube holds 0.031416 m³ per meter, a 250 mm tube about 0.049087 m³, a 300 mm tube about 0.070686 m³ and a 400 mm tube about 0.125664 m³. The jump between 300 and 400 mm is 78 percent, even though the diameter grew by only a third, which is the squared radius at work. Choosing the next tube size up for margin therefore costs a lot more concrete than it seems. Stepping from 250 to 300 mm raises the volume per meter by 44 percent. Check what the design requires before upsizing, and use the page with the exact height of each hole.

Planning the pour

Tube footings are easy to underfill because the volume per tube is small and each pour looks the same. Calculate the total with the allowance, then mix or order in one batch if possible to avoid cold joints between tubes. Wet concrete in a cardboard form should be placed and consolidated promptly, and the form should be braced so it stays plumb. After the pour, check the quantity used against the estimate. If you consistently use more than predicted, the holes are probably oversized, and a larger allowance will fit better on the next job.