A circle is a short cylinder
A round slab, a circular pad under a hot tub or fire pit, a post footing and a poured pier are all cylinders. Their concrete volume depends on two measurements: the diameter of the circle and the thickness or height of the pour. This page takes both in meters and returns cubic meters, which is the unit in which ready-mixed concrete is ordered in most countries. A percentage field adds a spare amount for spillage, a rough subgrade or a pour that runs a little thicker than planned. The page calculates a quantity. Whether the slab is thick enough, reinforced properly or founded on suitable ground is a design question it does not answer.
Radius, area and volume
The calculation runs in three steps. The radius is the diameter divided by two. The area of the circle is pi × radius². The volume is that area times the height, so volume = pi × (diameter / 2)² × height. The order volume is volume × (1 + waste / 100). Squaring the radius makes the diameter matter a lot: doubling it quadruples the volume for the same thickness. The page uses the full value of pi, so results can show many decimals, though a concrete truck cannot measure finer than about a tenth of a cubic meter. Use the same length unit for diameter and height, and meters in particular.
Why the default shows pi
With a diameter of 2 m, a height of 1 m and no allowance, the radius is 1 m, the area is pi m² and the volume is pi m³, or about 3.1416. That result is deliberate: it makes the formula easy to verify. A 1 m height describes a pier or a tank wall more than a slab. A typical slab is far thinner, often 0.1 m to 0.15 m, so enter your real thickness before using the result. With the default allowance of 0 percent, both outputs are equal. Change the allowance and the second output grows by that percentage while the first stays on the geometry alone.
A hot tub pad and a fire pit pad
A circular pad 2.4 m across and 0.15 m thick has a radius of 1.2 m. Its area is pi × 1.44, about 4.5239 m², and the volume is about 0.6786 m³. That is a small pour, roughly two thirds of a cubic meter. A fire pit pad 1.2 m across and 0.1 m thick holds about 0.1131 m³, and with a 10 percent allowance the order volume is about 0.1244 m³. Pads this small are usually mixed from bagged material on site rather than ordered by truck, so convert the volume into bags by dividing by the yield printed on the bag, which the manufacturer states for each bag size.
Measure the inside of the form
The label asks for an internal diameter because concrete fills the space inside the formwork. If you build a circle from bendable boards or a cardboard tube form, measure from inside face to inside face, not across the outside. A cardboard tube form is sold by its inside diameter, which is the figure to enter, and a wall thickness of a few millimeters is already accounted for in that label. For a pad poured against soil, the dug hole sets the diameter, and rough digging usually makes it larger than planned. Measure the hole at a few angles and use the average. Small differences matter because the radius is squared, so a hole 5 percent wider than planned adds roughly 10 percent to the volume.
Ordering ready-mixed concrete
Ready-mixed concrete is sold by the cubic meter in metric countries and by the cubic yard in the United States, and a truck has a minimum delivery size. Small orders often attract a short-load fee, which makes bagged material or a mixer on site cheaper below a threshold you can ask the supplier about. Concrete cannot be put back in the truck, and hardening begins as soon as water meets cement, so unused material is waste. Concrete does not dry so much as cure: the cement reacts with water over days and weeks, which is why a fresh pad is kept damp and protected rather than left to bake in the sun. Add an allowance for the shape of the excavation, spillage from the chute and settling of the base. Most pours include a margin of several percent, but the amount depends on how accurate your ground work is.
Cylinders beyond slabs
The same formula covers deep post footings, drilled piers and cylinder forms for decorative columns. For a footing 0.3 m across and 0.9 m deep, enter the diameter and the depth, and multiply by the number of footings. The page does not size footings. Depth, diameter and reinforcement for a fence post, deck pier or building footing depend on soil, frost depth and load, and local codes or an engineer set them. Use the volume result only to price and order. If you want a hollow cylinder such as a ring or tank wall, subtract the inner cylinder volume from the outer one, which requires two runs. For several identical footings, find one volume and multiply, adding the allowance once at the end rather than to each hole. Holes dug by auger are often slightly oversize at the top where the soil crumbles, so measure a sample hole before ordering the full amount.
Units you might meet
Plans in the United States use feet and inches. One foot is exactly 0.3048 m, so a 4 inch slab is 0.1016 m thick, and 4 ft is 1.2192 m in diameter. One cubic yard is 0.764554858 m³, and one cubic foot is 0.0283168 m³. Convert diameter and height to meters before using the page, then convert the cubic-meter result to cubic yards by dividing by 0.764554858 if your supplier works in yards. Keep conversions until the end of the calculation and round once, otherwise rounding errors build up and may add or lose a fraction of a bag.
Round slabs that are not perfect cylinders
The page assumes a perfect circular cylinder with a flat bottom and top, one thickness across the whole shape and an exact internal diameter. Domed surfaces, edge thickening, steps, sloped tops, rough ground and chamfers all change the real volume. The output is a quantity estimate and gives no structural advice. It does not size the slab, choose reinforcement or a concrete mix, or check frost, drainage or loads. For anything that carries weight, such as a hot tub, a vehicle or a structure, follow the requirements of a qualified designer and the local building authority.