Who uses tons of refrigeration
A ton of refrigeration, TR, is how many HVAC engineers, building managers and equipment suppliers in North America and several other markets rate cooling capacity. Chillers for office towers, hospitals, universities and data halls are sized in hundreds or thousands of tons. When a utility, a developer or a data center operator gives a power figure in gigawatts and the cooling plant is specified in tons, one conversion links the two. This page does that for the unit as defined by the HVAC industry, 12,000 BTU IT per hour. The converter treats the gigawatt as thermal power, so it tells you how many tons of cooling a flow of heat of that size would call for. Maintenance teams, energy auditors and students of building services meet the unit constantly, usually on a chiller nameplate or in a plant schedule.
How the ton is defined
One ton of refrigeration was originally the heat needed to melt one short ton of ice, 2,000 pounds, in 24 hours. With a latent heat of about 144 BTU per pound, that is 288,000 BTU per day or 12,000 BTU per hour. In SI terms, with the International Table BTU at 0.29307107 W per BTU/h, one ton is 3,516.8528 W, or 3.5168528 kW. Dividing 10^9 W by that figure gives 284,345.136 TR per gigawatt, the factor on this page. The ton here is a unit of power and has nothing to do with weight, which is an easy confusion for a first-time reader of a chiller data sheet.
Default and typical plant sizes
The default of 10 GW gives 2,843,451.36 TR, about 2.84 million tons. A 0.01 GW cooling load, which is 10 MW, is 2,843.45 TR, the scale of a large hospital campus or a mid-size data hall. A 0.45 GW load is 127,955.31 TR. A residential central air conditioner of 3 tons is only 10.55 kW, and a 500 TR chiller removes 1.758 MW of heat. District cooling plants in dense cities often run to tens of thousands of tons. The conversion shows that gigawatt-scale cooling would call for millions of tons, which is why such figures appear only for national or regional estimates. A restaurant walk-in cooler of about 3 TR, a school gym at 40 TR and an office tower at 800 TR show the scale ladder that facility staff work on every day. The first is 0.00001055 GW, a figure no one would write that way, and the last is 2.81 MW of cooling, since 800 TR times 3.5168528 kW is 2,813.5 kW. Kilowatts and megawatts suit those sizes far better than gigawatts do, and tons stay the working unit on the mechanical drawings themselves.
Data centers and heat rejection
A data center turns nearly all of its electrical input into heat, so a hall with 1 MW of IT load needs about 284 TR of cooling, since 1 MW is 0.001 GW and 0.001 × 284,345.14 is 284.35. Operators of a campus that draws 0.1 GW of IT power must reject 0.1 GW of heat, which is 28,434.5 TR. Real plants also have to reject the heat of fans and pumps, and they size chillers with margin. The page returns only the unit conversion for the thermal load you enter. It does not include the electrical power of the cooling equipment or the efficiency of the plant. A facility manager planning a server room expansion from 200 kW to 500 kW of IT load needs about 57 TR and 142 TR of cooling respectively, since 200 kW is 56.87 TR and 500 kW is 142.17 TR, and would add redundancy on top.
From tons back to gigawatts
Choose tons of refrigeration as the source and gigawatts as the target. The page divides by 284,345.136094. A district plant of 100,000 TR is 0.351685 GW, or 351.7 MW. A single 500 TR chiller is 0.00175843 GW, which is more readable as 1.758 MW. A 5 TR rooftop package unit is 17.58 kW. Use the reverse direction when a mechanical design is in tons and an electrical or utility document needs watts or gigawatts. The result is thermal power, so the electricity needed to run the chillers is much smaller, usually a fraction between one fifth and one third of the thermal load for a modern plant.
Tons versus BTU per hour and kilowatts
Product labels use a mix of units for the same quantity. A 12,000 BTU/h window air conditioner is one ton, which is 3.517 kW of cooling. A 2-ton split system is 24,000 BTU/h, or 7.03 kW. When two labels disagree, check whether one lists cooling capacity and the other lists electrical input, because the electrical power is typically a third or less of the cooling capacity. The page converts power to tons using the IT BTU. A homeowner choosing between a 2-ton and a 3-ton system is choosing between 7.03 kW and 10.55 kW of cooling, and the right size depends on the house, not on the largest number. If a catalog from another market gives a different value for the ton, check its definition before comparing numbers.
Sizing logic and common mistakes
Typical errors in cooling calculations are mixing up cooling capacity with electrical power, forgetting that heat rejected at the cooling tower is larger than the load by the compressor energy, and using weight tons. A load of 0.002 GW, which is 2 MW, needs about 569 TR at the evaporator, and the condenser must reject about 2 MW plus the compressor input. The page handles the first step only. For a project estimate, convert the heat load and add margin for peak days, future growth and redundancy, which engineering standards and the designer's judgment govern.
Cooling loads known to a few percent
The factor has 12 significant digits, but cooling loads are rarely known to better than a few percent. Quote the converted figure to three significant digits at most, for example 2.84 million TR for 10 GW. In a table, state the definition of the ton used, which is 12,000 BTU IT/h here. If a reader will compare with an electrical rating, show both units side by side. Remember that TR is also written as RT in some regions, and that 1 TR equals 3.517 kW, a figure worth memorizing for mental checks.