What the score is for

A backlog usually holds more good ideas than a team can build. A score gives the discussion a common starting point, and this page produces the simplest useful one: how much impact you expect for each unit of effort, after discounting the impact for uncertainty. An idea with a large impact estimate that nobody trusts ends up below a modest idea backed by evidence. An idea that costs a quarter of the team ends up below one that costs a week. The output is a weighted impact per effort score, shown to three decimals. It is a ranking aid for options measured on the same scales, and it says nothing about whether any single option is worth doing on its own.

Scoring impact by confidence and effort

The score equals impact × (confidence / 100) / effort. Impact is in whatever impact units your team defined, for example expected extra activated accounts per quarter or an agreed one-to-ten scale. Confidence is a percentage, so 80 means 80 percent and the page divides by 100 for you. Entering 0.8 would be read as 0.8 percent and shrink the score by a factor of one hundred. Effort is in comparable effort units, such as person-weeks, and must be positive because it is the divisor. The result has no currency or time unit of its own. It is a ratio of your impact unit to your effort unit, which is why scores from different scale choices cannot be compared with each other.

Impact 50, confidence 60 percent, effort 10

The page opens with an impact of 50, a confidence weight of 60 percent and an effort of 10. Confidence as a fraction is 0.60, so the weighted impact is 50 × 0.60 = 30. Dividing by an effort of 10 gives a score of 3.000. Change one input at a time to see the behavior. Raising confidence to 80 percent moves the score to 4.000. Doubling the effort to 20 halves it to 1.500. Doubling the impact to 100 doubles it to 6.000. Because the three inputs combine by multiplication and division, a change of a given percentage in any one of them changes the score by the same percentage, which is a useful check on whether a result looks plausible.

Comparing three candidate projects

Suppose project A has an impact of 80, a confidence of 90 percent and an effort of 12. Its score is 80 × 0.90 / 12 = 6.000. Project B promises an impact of 200, but the team rates its confidence at only 30 percent, and it needs an effort of 8. Its score is 200 × 0.30 / 8 = 7.500. Project C is a small, well-understood change with an impact of 35, a confidence of 100 percent and an effort of 5, which scores 7.000. B ranks first even though the team distrusts it most. If confidence in B falls to 20 percent, its score drops to 5.000 and it falls to last. A ranking that flips on a ten-point confidence change deserves discussion before anyone commits.

Assigning a confidence weight

The weight is a judgment, and the page does not treat it as a measured probability. A team can make it more consistent by tying levels to evidence. For instance, 100 percent might mean a shipped, measured precedent, 80 percent a prototype with user feedback, 50 percent a reasoned estimate with a few interviews, and 20 percent a hunch. Write the ladder down and apply it to every option. A 60 percent weight does not mean a 60 percent chance of profit or of reaching the impact estimate, and the page calibrates no monetary outcome. Its job is only to reduce the influence of impact figures that rest on thin support, so that enthusiasm does not outrank evidence.

Keeping impact and effort on shared scales

The ratio is meaningful only when every option uses the same definitions. Pick one impact measure, such as additional weekly active users or reduced support tickets, and convert each idea into it. Pick one effort measure, and count the same kinds of work for every option: design, engineering, review, testing, rollout and support. A score built from engineering time alone favors ideas that push work onto other teams. Very small effort values also inflate the score, because dividing by a number near zero produces a very large result. If an option looks extraordinary, check whether its effort estimate left out whole categories of work before celebrating.

How it differs from RICE

The widely used RICE method, described in a well-known Intercom write-up, multiplies reach, impact and confidence and divides by effort. This page leaves out reach, so it assumes that the options compared reach about the same audience, or that audience size is already included in the impact figure. If one idea affects every customer and another affects a niche segment, put reach inside the impact estimate or use a method with an explicit reach term. Intercom also suggests discrete impact levels and a short list of confidence values, which keeps estimates from implying precision they do not have. The convention here is simpler and can be adapted, provided the team states it.

Using the score in a planning meeting

The most productive use is as a conversation tool. Have each owner submit impact, confidence and effort for their idea ahead of the meeting, compute the scores, and sort the list. Then look for the entries where the score and the group's intuition disagree. A surprisingly high score usually points to an optimistic impact figure or a missing slice of effort, and a surprisingly low one may point to an idea whose benefit is hard to put into the impact unit. Revisit the same list after launch and compare the estimates with what happened. Over a few cycles that comparison shows whether your teams tend to over-promise impact, which tells you how much weight to give the confidence input.

Limits of a numeric ranking

A score cannot capture dependencies, legal obligations, security fixes, strategic bets or work that unlocks other work. Keep such must-do items outside the ranking and decide them separately. The three-decimal display does not mean the inputs are accurate to that degree, since each one is an estimate. Before acting on a close result, try plausible alternative confidence and effort values and see whether the order changes. When two options sit within the noise of each other, choose on other grounds. The page claims no industry threshold for a good score and no expected realized effect, so a score of 3 or 30 has meaning only relative to other options scored the same way.