A quote in one line

A landscape supplier quote for river rock usually has three parts: a volume, a price for each cubic meter and a delivery charge. This page adds them together as cost = quantity × price + delivery, giving the total you should expect to pay. It does not look up prices. The numbers you enter are from your own quote, and any currency works as long as price and delivery use the same one. The page is useful for comparing suppliers, checking an invoice against the quote and seeing how much the order changes when you change the quantity by a few cubic meters.

What each input means

Ordered material volume is the quantity you will actually buy, which for a bed is usually the order volume that includes an allowance, and you can get it from the River Rock Calculator. Price per cubic meter is the supplier price for the stone, before delivery. Delivery and other quoted charges can include a per-load fee, a fuel surcharge, a minimum-load charge, loading fees and sales tax if you want one total. If your supplier prices by the tonne, the price needs converting to a cubic meter price first, which depends on the bulk density they give. The page cannot know which unit your quote uses, so check it before typing.

Costing 12 cubic meters of river rock

The example order is 12 m³ at 25 per cubic meter with 15 for delivery. Material costs 12 × 25 = 300, and adding delivery gives 315.00. The numbers are hypothetical and say nothing about what river rock costs in your area, which varies with stone type, color, size, distance from the quarry and local demand. Notice that delivery here is under 5 percent of the total. On a small order, the opposite is common: delivery can be larger than the stone. That is worth watching because the fixed part of a quote does not scale with volume.

River rock priced with and without delivery

Suppose one supplier charges 54 per cubic meter plus 60 delivery, and another charges 61 per cubic meter with free delivery. For 2 m³ the first costs 2 × 54 + 60 = 168, and the second costs 2 × 61 = 122. The cheaper stone price loses on a small order. Raise the volume to 10 m³ and the first comes to 600, while the second is 610, so the order flips. The break-even point is where the 60 delivery charge equals the 7 per cubic meter difference, which is about 8.6 m³. Running both quotes through the page at your own volume avoids guessing where you sit relative to that point.

Price per tonne to price per cubic meter

Quarries often sell by weight. To compare with a per-cubic-meter quote, multiply the price per tonne by the bulk density in tonnes per cubic meter, which is the density in kg/m³ divided by 1,000. With an illustrative density of 1,600 kg/m³ and a price of 40 per tonne, the price per cubic meter is 40 × 1.6 = 64. A different density changes the answer in proportion, so take the figure from the supplier rather than a general table. A metric tonne is 1,000 kg. A US short ton is 907.18474 kg, so a price per short ton is a little lower per kilogram than the same number per tonne.

What to include in delivery and other charges

Put every quoted charge that does not depend on volume into the last field. Many suppliers add a delivery fee that rises with distance, a minimum charge for small loads, a charge for waiting time if the truck must wait while you shift the pile, and a fee for placing the stone in a wheelbarrow-accessible spot. Sales tax or VAT may apply to the sum, and the rules differ by place, so enter the tax-inclusive figures if you want an all-in cost. Leave out items that you pay for separately, such as fabric and edging, so the total compares fairly with another supplier.

Planning the volume you order

The cost scales linearly with volume, so an error in the quantity carries straight into the total. Work out the bed volume first, add an allowance for settling and spillage, and then enter the result here. Running a little extra costs only the extra volume times the price, while running short costs a second delivery. Suppliers may also set minimum loads or sell in half-cubic-meter steps. If the minimum is larger than you need, compare the cost of buying the minimum against bagged stone, which has a higher price per cubic meter but no delivery fee. Leftover stone is rarely wasted, since it can top up a bed later, fill a drainage trench or edge another border. Even so, price the surplus as part of the job when you compare quotes.

Checking an invoice

After delivery, a quick check compares the invoice with your own working. Divide the invoice total minus the delivery by the price per cubic meter to get the volume billed. If it differs from your order, ask how the load was measured. Some suppliers bill by loader bucket, others by weight converted to volume, and the conversion factor may favor the supplier slightly. Keeping the original quote and the page result side by side makes it easy to see where any difference comes from. The page does not audit a supplier, but it gives you the arithmetic to ask a precise question. Keep the delivery ticket too, because it normally states the product name, the quantity and sometimes the weight, which settles most disputes before they start.

What the river rock total leaves out

Prices in the example are hypothetical, and the page presumes no market price, tax or density. It multiplies and adds what you enter, so it will not warn you if the quantity is in tonnes while the price is per cubic meter. Currency is whatever you use for both price fields. Rounding is to two decimals for display. The result is an estimate of the order cost from your own quote, not a contract price. Confirm the final figure, the delivery date and any extra charges with the supplier before you commit. Ask whether the quoted price holds if you change the quantity, because some suppliers give a lower rate above a set volume and the page cannot know that. Run the page again with the new price to see the difference.