Turning a volume and a quote into a total
You have a volume and a quote, and you want a total. The formula is cost = quantity × price + delivery, which is short enough to do on paper, yet small mix-ups with units are what make asphalt quotes confusing in practice. This page keeps the three inputs labeled and the result in one place, so you can compare two quotes, test a larger or smaller order, or see how much of the total is the fixed delivery charge. It does not look up prices. The numbers you enter are yours, from a supplier quote or a contractor estimate, and the page presumes no market price, tax or density.
How the total is built
Quantity is the ordered volume in cubic meters. Price is the amount per cubic meter, in whatever currency you are using. Delivery is a single sum in the same currency for transport, minimum-load fees, fuel surcharges or any other charge on the quote that does not scale with volume. The calculator multiplies the first two and adds the third. With the defaults, 12 cubic meters at 25 per cubic meter is 300, and adding a delivery charge of 15 gives 315.00. The default prices are hypothetical numbers chosen for clean arithmetic. They are not a statement of what asphalt costs, which varies by region, mix and time.
A worked quote
Imagine a quote of 210 per cubic meter with a delivery and haulage charge of 120, for an order of 8.4 cubic meters. The material comes to 8.4 × 210 = 1,764, and with delivery the order totals 1,884.00. Now shrink the order to 6.3 cubic meters with the same terms: 6.3 × 210 = 1,323, plus 120, gives 1,443.00. The delivery charge did not change, but it now represents a larger share of the bill. This is why small orders look expensive per cubic meter, and why combining two jobs into one delivery can bring the effective unit cost down. All figures here are illustrative, not market prices.
Making the quantity match the price
The price must use the same unit as the quantity. Asphalt is frequently sold by the tonne, and a quote in currency per tonne cannot be multiplied by cubic meters. If your quote is per tonne, divide the order weight in tonnes by one, not by volume, or convert your volume to tonnes first using the supplier density. The asphalt weight page on this site multiplies a volume by a density you enter, and dividing the kilograms by 1,000 gives tonnes. Alternatively, convert the unit price to a per-cubic-meter figure by multiplying the per-tonne price by tonnes per cubic meter. Either route works, as long as you only do it once and write down the density you used.
Where the volume comes from
The ordered volume should come from your measured quantity plus whatever allowance you decided to carry. The asphalt calculator on this site gives both the measured volume and a figure with a percentage added, and the second number is the one to enter here if that allowance is what you will actually order. Ordering the measured volume with no margin leaves nothing for trimming at edges or an uneven sub-base. Ordering too generously costs money for material that may be wasted. A second, short delivery to finish a job often costs more per cubic meter than a modest extra margin on the first load, which is worth weighing before you finalize the order size.
What counts as delivery and other charges
The third field is a single lump sum. Put in transport, a short-load or minimum-order fee, a tipping or waiting charge, a fuel surcharge and any other fixed item that appears on the written quote. If the supplier charges per delivery, and you expect two deliveries, enter the total for both. Do not put tax in this field unless you intend to treat tax as a lump sum, because tax usually applies to the whole bill and not only to a fixed amount. If you want the total including tax, calculate the subtotal here and then apply the tax rate that your own quote or local authority states.
Putting two asphalt quotes on equal footing
To compare two quotes, run each one through the page with the same quantity. Supplier A at 190 per cubic meter with 160 delivery and supplier B at 205 with 40 delivery give different answers depending on the order size. For 4 cubic meters, A totals 920.00 and B totals 860.00. For 12 cubic meters, A totals 2,440.00 and B totals 2,500.00. The cheaper supplier changes with the volume, because a lower unit price pays off only once the quantity is large enough to outweigh a higher fixed charge. These numbers are illustrative, but the pattern is real, and it is easy to see by changing only the quantity field.
Supply only or supply and lay
Asphalt quotes come in two broad forms. A supply-only quote prices the mix at the plant or delivered to site, and you provide the labor, the spreading and the rolling. A supply-and-lay quote bundles the crew, the paver or hand-lay work and the compaction equipment, usually at a price per square meter at a stated thickness instead of per cubic meter. This page works from a per-cubic-meter price, so a lay price quoted per square meter has to be converted first. Divide the square-meter rate by the thickness in meters to get a rate per cubic meter. For example, a rate of 18 per square meter at 0.06 m is 300 per cubic meter. That figure is illustrative, but the conversion is exact, and it lets you compare a lay quote with a supply-only quote on the same basis.
Charges an asphalt total may not include
The result is an arithmetic estimate based on the numbers you supply. It does not know market prices, taxes, density or whether the quoted price includes laying and rolling. Read the quote carefully to see whether it covers supply only or supply and installation, and enter only the charges that match what you are estimating. Currency is whatever you use, and all three fields must share it. Rounding to two decimals is applied to the displayed total. If you need to match a supplier invoice to the cent, use the exact unit price printed on it, including any decimals beyond two.