Covering a bed with stone
River rock is water-worn gravel and cobble used as decorative stone in garden borders, dry creek beds, drainage swales and the base of planters. It is delivered by the truckload, in bulk bags or in small sacks, and either way the order starts as a volume. This page multiplies the length, width and depth of the area and shows cubic meters. An optional percentage turns the measured volume into an order volume. It does not choose a stone size, recommend a depth or say how the stone is shaped. You decide those, and the page keeps the arithmetic honest.
River rock volume from three measurements
Volume equals length × width × depth in meters. Order volume equals volume × (1 + waste / 100). Depth is the one people mistype. A 100 mm layer is 0.1 m, a 60 mm layer is 0.06 m, and a 5 cm layer is 0.05 m. If you enter 100 or 60 by mistake, the answer is a thousand times too large and should look absurd. Results show six decimals but you rarely need more than two, since a truck or a bag cannot deliver finer than a few hundredths of a cubic meter. One cubic meter is 1,000 liters, which is handy for converting to bagged stone.
River rock for a 10 by 4 meter bed
The page starts with 10 m, 4 m and 0.1 m, which gives 4 m³, and 10 percent extra, which gives 4.4 m³. That is a large area for decorative stone and is meant to show the arithmetic. A 4.4 m³ order would likely come on a truck rather than in sacks. The default percentages are illustrative. If you change the depth to 0.05 m, the volume halves to 2 m³ and the order volume to 2.2 m³. This is a good habit when planning: change the depth first, because it has the largest effect on cost and is easy to adjust after the bed is built.
A dry creek bed and an edging strip
A dry creek bed that is 10 m long, 0.8 m wide and 0.1 m deep holds 0.8 m³. The lining and bank stones are irregular, so a 20 percent allowance is reasonable, and the order volume is 0.96 m³. A thin strip of river rock edging a path might be 12 m long, 0.5 m wide and 0.06 m deep, giving 0.36 m³. With a 10 percent allowance the order is 0.396 m³. For small amounts like this, bulk bags or sacks are more practical than a truck. At 40 liters per sack, 0.396 m³ is 396 liters, or 9.9 sacks, so you would buy 10.
Stone size and depth
River rock is sold in size ranges, from small pebbles to cobbles several centimeters across. The depth of the bed should be at least about two stone diameters so the layer looks full and covers the fabric or soil underneath. A bed of 40 mm stones therefore wants at least 80 mm, while small pebbles can look right at 40 mm. Larger stones leave bigger gaps and may need more depth for coverage, which raises the volume. These are practical rules of thumb, not a standard. Look at a sample spread on a small patch of your own ground before you order the whole quantity.
Underlay and edging
Stone laid straight on soil sinks into it, and weeds grow up through the gaps. Many gardeners put down woven landscape fabric or a layer of compacted base, which holds the stone up and keeps the layers apart. Fabric is bought by area and the stone is bought by volume, so keep the two orders separate. An edge of timber, steel or stone stops rock from creeping onto lawns and keeps the depth uniform near the border. If the bed lies on a slope, rounded stones roll downhill, so use larger cobbles or build small terraces. The calculator counts stone only.
From volume to weight and cost
Quarries and landscape suppliers often price by weight, so you need to know how heavy your order is. Multiply the volume by the bulk density that the supplier gives for your stone. The River Rock Weight Calculator on this site does exactly this multiplication, and the River Rock Cost Calculator turns an order volume, a price per cubic meter and delivery charges into a total. Run the order volume from this page into either one. Keep units aligned: if the price is per tonne, you need the weight first, and if it is per cubic meter you can use the volume directly.
Allowance and settling
River rock drops into soft ground, spills over edges and ends up as thicker patches where the surface is uneven. The allowance covers that. For a bed on a firm base with a clean edge and a depth gauge, 5 percent may be enough. For irregular ground or a curved creek bed with cobbles at the banks, use 15 to 25 percent. You can also order a little less than the full amount and top up if needed, but a second delivery costs more per cubic meter. The page applies your percentage to the measured volume. It does not estimate compaction, moisture or supplier yield, so ask the supplier how their delivered volume is measured. A loader bucket is not a precise measure, and a heaped bucket holds more than a level one. If accuracy matters, ask for the load by weight and convert it with the bulk density so both sides of the sale use the same figure.
Limits of a rectangle
The page treats the bed as a rectangle with a flat, uniform depth. A creek bed with sloping banks or a curved path is better measured as several rectangles. The result is a quantity estimate, not a design, and it does not size any wall, drainage channel or structure. Moisture, density and the packing of stones are not inferred, so ask for the supplier yield before you rely on a final figure. If the stone is going near a house, check where water will flow so the bed does not send runoff toward a foundation. A shallow swale lined with stone should carry water to a safe outlet, and the length and width you enter here are those of the lined channel, not of the whole garden around it.