Filling low spots and building up grade
Fill dirt raises a low area, builds a pad for a shed or a slab, levels a yard before seeding, or backfills around a foundation. In each case the quantity is the volume of the space between the existing ground and the planned surface. This page multiplies length, width and depth and offers a second result with a percentage added. It assumes a rectangle filled to a uniform depth. It does not select the kind of fill, which depends on what will be built on top, and it does not specify the compaction needed for a structural pad.
The inputs and the arithmetic
The measured volume is length × width × depth, and the volume with allowance is that figure × (1 + waste / 100). The starting values of 10 m, 4 m, 0.1 m and 10 percent give 4 m³ and 4.4 m³. Depth is the average thickness of fill you need, in meters. For a flat lawn raised 75 mm, enter 0.075. For a pad that rises from 0.2 m at one edge to 0.6 m at the other, the average depth is 0.4 m, since the slope is uniform, and you can enter that.
Example: leveling a yard
A yard of 12 m by 9 m that needs an average of 0.15 m of fill takes 16.2 m³. With a 20 percent allowance for settling, the order is 19.44 m³. Soil placed in layers settles with rain and traffic. Some of the allowance accounts for that, and some for the difference between loose delivery and the compacted state, which the page does not infer. Grass seed grows better in topsoil than in subsoil, so a thin layer of topsoil usually goes on top, and that layer is a separate order with its own depth.
Example: a shed pad
A pad for a 3 m by 4 m shed, extended 0.5 m on each side, is 4 m by 5 m. Built up by 0.3 m with compacted fill, it needs 6 m³. Adding 15 percent gives 6.9 m³. A pad that carries a structure needs engineered fill, laid in thin lifts and compacted, and often topped with crushed stone. The design comes from the shed manufacturer or the local building rules. This page gives the volume, and the grade of fill and the compaction are decisions made elsewhere. If the pad is surrounded by timber or block edging, the edging holds the fill in and defines the plan size, so measure inside it. For a base that also gets 0.1 m of crushed stone on top, deduct that thickness from the fill depth and calculate the stone separately, so the two orders add up to the total height of the pad without overlapping.
Loose, compacted and shrinkage
Fill is delivered loose and then compacted, so the finished volume is smaller than the delivered volume. The difference depends on the material and the compaction effort. Coarse sand and gravel compact little, and clay and silt compact more. Engineers use shrinkage factors that account for this, and the right figure depends on the soil and the specification. The allowance field is where you apply it. A common approach is to ask the supplier or the project engineer for a loose-to-compacted ratio, then enter the extra percentage that results.
Types of fill
Fill dirt is a loose term. Topsoil is rich in organic matter and supports plants, but it settles and is not suitable under structures. Common fill, clean fill and select fill vary in cleanliness and gradation, and structural fill is specified by particle size and compaction. Crushed stone, sand and gravel are also used. Ask for a description of the material and for test data if the project needs it. Organic material, trash and large debris cause settlement as they decay, so avoid dirt with those things in it.
Drainage and grading
Fill changes the way water moves across a site. A pad built up near a house should slope away from the foundation, and a fill that blocks a natural drainage path can flood a neighbor's property. Local grading rules may apply, and some places need a permit for large fills. The calculator works with a flat layer, and a surface with a slope for drainage has an average depth you can enter. Plan the finished grade first, then work out the volume needed to reach it. A practical way to find the average depth is to set stakes on a grid, mark the finished height on each, measure how far each mark sits above the existing ground, and average the readings. Six readings of 0.10, 0.14, 0.18, 0.12, 0.16 and 0.20 m average 0.15 m, which is the depth to enter. More stakes make the average more reliable, and a laser level speeds the work.
Ordering and hauling
Fill is sold by the cubic yard, the cubic meter or the ton, and by the truckload. A truck delivers a limited volume per trip, and distance sets the delivery fee. Because fill is heavy, the weight limit matters as much as the volume. Ask whether the price covers delivery, spreading and compaction. If you get fill free from a construction site, check its quality, since free fill can contain debris or contaminated soil. Keep a record of the source and delivery tickets in case questions come up later. The 19.44 m³ yard order is about 25.4 yd³, since 19.44 / 0.764555 is 25.43. At an assumed density of 1,500 kg/m³, an illustrative figure only, it weighs about 29,160 kg. Haulers often have a legal weight limit per trip, so ask how many loads they expect and whether they can spread the deliveries over two days if your driveway or lawn is soft.
Compaction and shrinkage in fill dirt
The result is the volume of a rectangular space with a percentage added. The page does not infer compaction, moisture, density or supplier yield, and it does not design a structural fill. Slopes, steps and irregular outlines need averages or separate sections. Confirm the material, the compaction requirements and the quantity with your supplier, engineer or building department before you order. Take photographs of the area and a few depth readings before the first load arrives, so that any dispute about quantity can be settled against the original ground level.