Ordering crushed stone, gravel and sand by volume
Aggregate is the general name for crushed stone, gravel, sand and similar granular fill. It goes under slabs, along pipe trenches, behind retaining walls and on driveways, and suppliers quote it in cubic meters, cubic yards or tonnes depending on the region. Before you phone a quarry or a builders merchant, you need one number: how much space the finished layer occupies. This page produces that number from three measured dimensions and then shows the figure again with a percentage added, so you can see how much a cushion changes the order. It stays at the volume stage. Converting the volume to a weight, or a weight to a truck count, needs facts that only your supplier can give you, and the calculator does not guess them.
Length, width and depth to cubic meters
The measured volume is length × width × depth. Because every input is in meters, the answer comes out in cubic meters with no conversion factor. The second output is the order volume, calculated as volume × (1 + waste / 100). A waste entry of 10 means ten percent more than the measured figure, so the multiplier is 1.10. Entering 0 makes the two outputs identical. The allowance is applied once, to the whole volume, which means you should not also pad the individual dimensions. Both results are shown to six decimal places, which is far finer than any tape measure, so round the number you give to a supplier to a sensible figure such as the nearest tenth of a cubic meter.
Aggregate for a 10 by 4 meter strip
The defaults describe a strip 10 m long and 4 m wide with a depth of 0.1 m, which is 100 mm, and a 10 percent allowance. The measured volume is 10 × 4 × 0.1 = 4 cubic meters. Adding ten percent gives 4 × 1.10 = 4.4 cubic meters. These numbers are chosen to be easy to follow, not to represent a recommended base thickness for any job. The example does show the scale: a modest 40 square meter area at a depth of 100 mm already needs several cubic meters, and that quantity of loose stone weighs in the tonnes, which is why delivery arrangements matter before you order.
A base layer under a path
Suppose a garden path is 12 m long and 3.5 m wide, and the specification calls for a 150 mm compacted stone base. Enter 12, 3.5 and 0.15, and the measured volume is 6.3 cubic meters. With an 8 percent allowance, the order volume is 6.804 cubic meters. A smaller job shows how quickly the numbers shrink: a 6 m by 2.4 m shed floor base at 50 mm is 6 × 2.4 × 0.05 = 0.72 cubic meters, and with a 15 percent allowance it becomes 0.828. Small jobs often carry a larger percentage allowance because a few spilled wheelbarrow loads are a bigger share of the total. Neither allowance is a rule, and you should choose the figure your own site conditions justify.
Millimeters, depth and the most common slip
Depth is the input people most often get wrong. Builders speak in millimeters or inches, and the page wants meters. A 100 mm layer is 0.1, a 75 mm layer is 0.075 and a 40 mm layer is 0.04. Typing 100 into the depth field would report a volume a thousand times too large. If you work in inches, divide by 39.3701 or multiply by 0.0254, since one inch is exactly 25.4 mm. A quick sanity check helps: a layer a few centimeters thick over a driveway should come out as a few cubic meters, not hundreds. If the output looks absurd, look at the depth first and the length and width second.
Why volume is not the whole answer
Two aggregates can fill the same cubic meter and weigh very different amounts, because rock type, grading and moisture all change bulk density. Suppliers usually sell by weight, and a delivery note lists tonnes. To compare quotes you need the supplier bulk density for the exact product, which you can then multiply by the volume. The asphalt weight page on this site does that multiplication for a density you enter. As an illustration only, a bulk density of 1,600 kg/m³ would turn the 4.4 cubic meters above into 7,040 kg, but you should replace that figure with the number your supplier gives for the stone you are buying.
Compaction and settling
Granular material that is spread loose and then compacted ends up thinner than it started. If the depth you enter is the finished compacted thickness, the volume you need to order is larger than the page output, because loose material has more voids. The calculator does not infer a compaction ratio, since that ratio depends on the material and the equipment. Some contractors add the compaction margin as part of the allowance percentage. If you do that, say so in your notes, so that the same margin is not added twice by someone reading your order later. Trench backfill, bedding sand and sub-base each behave differently, and local specifications often state a required compaction level separately from the thickness.
Sizes of stone and what they are used for
Aggregate is graded by particle size, and the grade affects both the job and the order. Coarse crushed stone with a nominal size of a few tens of millimeters is typical for road base and drainage layers, where gaps between the pieces let water pass. Smaller crushed fines and sharp sand fill gaps and give a firmer, more compactable bed under pavers. Rounded pea gravel drains well but shifts underfoot. The calculator does not care which one you choose, because volume is geometry, but your supplier prices each grade differently and each one packs to a different density. Name the grade on the quote, and check that the supplier understands your layer thickness, since some grades should not be laid thinner than about twice their largest particle.
Irregular shapes and what the page leaves out
The page treats the area as a single rectangle with a uniform depth. For an L-shaped yard, split it into rectangles, calculate each one, and add the volumes, which also lets you give each section its own depth. Curved edges can be approximated by a rectangle that matches the average width. The result does not size a structural member, check drainage or bearing, or select a grade of stone. Those decisions belong to the project specification or a qualified designer. Treat the output as a quantity estimate that supports an order, and confirm the final amount against the supplier delivery units before you commit.