What the order covers
Topsoil is sold by volume, and mistakes in the order show up as bare patches or a pile left over at the curb. This page converts the size of the job into a volume to buy. You enter the area to cover in square meters, the depth of soil in meters and an extra allowance in percent. It returns the required ordered volume in cubic meters. The defaults, 40 square meters, 0.05 meters and 10 percent, give 2.2 cubic meters. A depth of 5 centimeters is a thin layer used for patching, so change it to match your job. Nothing in the result tells you the texture, organic content or weight of the soil, so those are questions for the supplier.
How the volume is computed
Volume equals area times depth times 1 plus waste over 100. The soil forms a layer with the same footprint as the job, so the net volume is area times depth, and the allowance scales it up. For 40 square meters at 0.05 meters, the net volume is 2 cubic meters, and with 10 percent extra it is 2.2. For a new lawn of 150 square meters at 0.1 meters, the net volume is 15 cubic meters and with a 10 percent allowance it is 16.5. Depth must be in meters, so convert from centimeters by dividing by 100 and from inches by multiplying by 0.0254. A frequent error is entering 10 for 10 centimeters, which makes the order 100 times too large.
Depth for lawns and beds
How deep the topsoil needs to be depends on what is growing and what lies underneath. For a new lawn, guidance from many extension services calls for several inches, often 10 to 15 centimeters, of loosened, good-quality soil for roots, though the right figure depends on the existing subsoil. Vegetable beds do better with deeper, well-prepared soil. A thin layer of a centimeter or two is used to fill hollows or overseed, not to establish new growth on hard ground. Planting trees and shrubs involves different practices, with soil prepared at the planting hole. Check recommendations from your local extension service or a landscape professional, as the best depth varies with climate and plants. The page converts the depth you choose into a volume.
Settling and the allowance
Fresh topsoil is loose and settles after watering and rain. A layer placed at 10 centimeters can drop by one to two centimeters over a season, and the allowance gives you some extra for this. It also covers soil lost at the edges and left on the tarp. The default of 10 percent suits tidy jobs, and uneven ground or leveling work may need more. If you plan to rototill the topsoil into the existing ground, the volume you need depends on the mix you want, for example half existing soil and half imported soil. Compute the final layer depth and multiply by the share that is imported. Ask the supplier how their volumes are measured and whether they are loose or compacted.
Worked example for a raised bed
A raised bed of 4 square meters, say 2 by 2 meters, is to be filled with topsoil to 0.3 meters. The net volume is 4 times 0.3, which is 1.2 cubic meters. With a 10 percent allowance the order is 1.32 cubic meters. In cubic yards, 1.32 divided by 0.764555 is about 1.73. Many suppliers deliver in half-yard steps, so you would round up to 2 cubic yards or ask for a mix of soil and compost. Now consider a smaller leveling job: 20 square meters of lawn with a hollow to fill to an average of 0.04 meters needs 0.8 cubic meters, and with a 15 percent allowance the order is 0.92. These are illustrative numbers for the arithmetic.
Topsoil is not a defined product
The word topsoil covers a wide range of materials. Natural topsoil comes from the upper layer of a site, screened to remove stones and roots. Manufactured topsoil blends sand, compost and subsoil to a recipe. Quality varies a lot, with differences in organic matter, texture, pH and contaminants. Some regions have standards, such as ASTM D5268 in the United States for topsoil used for landscaping. Ask the supplier what the product is, whether it is screened, and whether there is a test report. A soil test from a lab can tell you pH and nutrient levels, and it may suggest amendments. The page does not judge quality and returns only a volume.
Converting units and sizing deliveries
Topsoil may be quoted by the cubic yard, the cubic meter or the tonne. One cubic yard is 0.764555 cubic meters, so 2.2 cubic meters is about 2.88 cubic yards. If the price is per tonne, you need a bulk density from the supplier, and moist topsoil can weigh well over a tonne per cubic meter. A pickup truck bed carries a limited volume, and a load of wet soil can exceed the payload, so check the weight. For small jobs, bags of 25 or 40 liters are practical, though 2.2 cubic meters would take 88 bags of 25 liters, which is rarely worth the carrying. For large jobs, ask for delivery and have a place to dump it. Spread it soon, since piles on lawns kill the grass beneath.
Slopes, drainage and grade
A flat layer is rarely the whole story. Topsoil placed against a house must slope away from the foundation, and many guides suggest a gradual fall of a few percent for the first meters. Slopes may need erosion control until plants root. The page assumes a uniform depth over the stated area, so a sloped site or one with high and low points needs a better estimate. Divide the site into sections, each with its own average depth and area, and compute them separately. Add the volumes. Do not bury the base of trees or raise the soil level against the trunk, as extra soil can harm roots, and consult an arborist when you work near mature trees.
Typical input slips with topsoil
Topsoil orders tend to go wrong in a few specific ways. The area is taken from a plan that was never checked against the site, so measure the lawn or bed on the ground, and remember that a square foot is 0.092903 square meters, so 1,500 square feet is 139.4 square meters. Existing soil may be stripped or compacted before the new layer goes in, which changes the final level. The nominal depth is used on a surface that is uneven, when it should be measured at several points and averaged. The allowance and depth fields get mixed up: an allowance of 10 means 10 percent, while a depth of 0.1 means 10 centimeters. Compare the result with the size of the yard, because 220 cubic meters for a suburban lawn means a decimal slipped.
What the volume does not decide
This page is an arithmetic estimate of volume. It does not test the soil, choose a blend, set a planting plan or judge drainage. It does not calculate weight, price or delivery. Handling soil can raise dust and expose you to organic material and possible contaminants, so wear gloves and wash your hands afterward. Before digging in an area, call your local utility locating service so that buried lines are marked. For land that was previously used for industrial purposes, orchards or near old painted buildings, consider soil testing for contaminants before bringing in soil or growing food.
Reading a soil test before you order
A soil test from a laboratory reports pH, organic matter and nutrient levels, and often suggests amendments for the plants you intend to grow. It can show that your existing soil is fine and that you need only a thin top dressing, or that it is compacted clay that will need more work than added topsoil can fix. Many local extension services offer inexpensive soil testing. Placing a few centimeters of good topsoil over poor compacted ground often disappoints, because roots stay in the topsoil layer and water does not move across the boundary. Loosening the subsoil first, and mixing the new layer into the top of the old one, helps. The quantity from this page is the same either way, but the preparation changes the result.
Screened, unscreened and blended products
Suppliers offer topsoil in several grades. Unscreened soil is cheaper and may contain stones, roots and clumps. Screened soil passes through a mesh, often 10 to 15 millimeters, and spreads more evenly. Blended soils mix topsoil with compost or sand, and may be sold for lawns, vegetable beds or planters. Because blends are made to a recipe, the moisture and organic content are more consistent, though the price is higher. Ask for the particle size, the organic content and whether the soil is free from weed seed and invasive plant material. The page treats all of them the same, as a volume. For a small area, the extra cost of screened product is often worth the time saved in raking and removing stones.
Seeding, sodding and the final level
The level of the topsoil relative to surrounding surfaces matters. When laying sod, the surface of the soil should sit slightly below paths and edges, by the thickness of the sod, so the finished lawn is flush. For seed, the soil should be a little above the edges to allow for settling, and the surface should be raked fine. If you are planning sod with a thickness of about 2.5 centimeters, subtract that depth from the final level to find the depth of topsoil. Water the soil lightly before laying, and compact it with a roller or by walking over it, then rake out hollows. Doing this before the final measurement gives a more accurate volume, since the depth you apply should be the compacted depth.