What this page measures

Crushed stone is used under pavers, slabs and driveways, around drainpipes, and in the bed of a French drain. In each case the stone forms a flat layer, and the quantity is the area covered times the depth. Enter length, width and depth in meters, plus an allowance percentage. The page returns the measured volume and a volume with allowance. It does not decide which stone grade you need, how thick the layer should be, or how far the material will compress. Those choices come from the project design, the paving manufacturer or local practice, and the page assumes you have made them.

The two results

Volume = length × width × depth, and the volume with allowance is volume × (1 + allowance / 100). The inputs start at 10 m, 4 m and 0.1 m with a 10 percent allowance, so the output is 4 m³ and 4.4 m³. Keeping the two results apart is useful because the first matches the space on the drawing and the second matches what you intend to buy. If you want to compare scenarios, change only the allowance and watch the second result move while the first stays fixed. Depth must be entered in meters, so a 150 mm layer is 0.15 and a 4 inch layer is 0.1016.

Example: a paver patio base

A patio 6 m by 4 m with a compacted base of 150 mm needs a measured volume of 3.6 m³. Allowing 15 percent for the settling and spreading of loose material gives 4.14 m³. Base depth under pavers depends on soil, traffic and the manufacturer's guidance, and thicker layers are often used where vehicles will drive. If the patio is also getting a bedding layer of sand, that layer is a separate calculation with its own depth. Keep each layer in its own run so you can order the right material in the right quantity. Compare the numbers with a thinner base for a footpath: the same 6 m by 4 m footprint at 100 mm needs 2.4 m³ measured, which is a third less stone than the 150 mm base, so the thickness decision is the biggest lever on the order.

Example: a drainage trench

A drain trench that is 20 m long, 0.4 m wide and 0.5 m deep holds 4 m³ of stone when it is filled completely. With a 10 percent allowance the page returns 4.4 m³. In practice, drainage designs often wrap the stone in a geotextile fabric and place a perforated pipe in the middle, so the pipe takes up some of the space. A 100 mm pipe over 20 m has a volume of about 0.157 m³, so the stone needed is slightly less than the full trench. Subtract the pipe volume yourself if you want a tighter figure.

Loose volume versus compacted volume

Crushed stone is delivered loose and packed down by a plate compactor or roller. It usually occupies less space after compaction than it did in the truck, so the loose volume you buy should exceed the finished layer. The calculator does not infer how much, since the shrinkage depends on the grading of the stone, the equipment and the layer thickness. That is the purpose of the allowance field. Ask your supplier or the paving manufacturer what extra they recommend, and enter their figure. Placing the base in lifts of limited thickness, compacting each one, also affects how much stone you use. A thick layer compacted in one pass tends to stay loose at the bottom, while thin lifts reach a denser, more even state. After the first compaction pass, a surface that has dropped below the grade line needs a top-up, and that top-up is part of the allowance you chose at the start.

Choosing the stone and the thickness

Crushed stone comes in graded sizes, from fine stone dust used for leveling to larger angular stone used for drainage and structural fill. The size label differs by region, so describe the use to the supplier and ask what they sell for it. Open-graded stone with few fines drains well, while a well-graded base compacts to a firm surface. Layer thickness is part of the design, and for a driveway, a pipe bedding or a retaining wall backfill, it is often given in drawings or standards. The page applies your thickness exactly as entered.

Converting volume to tonnes or tons

Stone is often sold by weight, and the volume from this page must be converted. The crushed stone weight page multiplies volume by a bulk density that you supply. As an illustration only, a bulk density of 1,600 kg/m³ turns the 4.14 m³ patio order into 6,624 kg. The real figure depends on the stone type, the grading and its moisture, so use the number from your supplier. Asking whether the price and the delivery ticket are in tonnes, short tons or cubic yards avoids a nasty surprise at the quote stage.

Edges, slopes and irregular shapes

Beds with a curved edge can be approximated by splitting them into rectangles and triangles, and the volumes added. A sloped base, such as a walkway pitched for drainage, varies in depth, so use the average. Stone placed against a retaining wall or a kerb may need extra depth at the edge. The page treats the layer as a flat rectangular slab of stone with uniform depth, so shapes that do not fit that description have to be broken down first. Sketching the shape and listing each piece keeps the total honest. A circular bed of 3 m diameter and 0.2 m depth, for instance, has an area of pi × 1.5² and a volume of about 1.414 m³, which you can get by working out the area first, about 7.07 m², and typing it as the length with a width of 1. A trapezoid or a triangle works the same way once you have computed the area.

Compaction a crushed stone volume does not model

The result is a geometric volume with a percentage added. It does not account for compaction, moisture, density or supplier yield, and it does not size a structural member or a pavement section. Local codes, the paving manufacturer or a geotechnical designer should set the base thickness and the stone specification for any load-bearing surface. Confirm quantities with your supplier before ordering, and remember that delivery, minimum loads and rounding rules can change what you end up paying for.